CONCEIVING WASTEWATER TREATMENT IN 2020
Energetic, environmental and economic challenges (ES1202)
COST

STSMs

Acceptance list for STSMs 2016

The following 11 STSMs will be performed during the fourth grant period, in this ocassion from 1st February 2016 to 30th  April 2016.

STSMs summary for the 3rd Grant Period (2015)

The following 11 STSMs will be performed during the third grant period (from 1 February 2015 to 31 November 2015)

STSMs summary for the 2nd Grant Period (2014)

The following 11 STSMs with a duration between 1.5 to 3 months have been performed during the second grant period.

STSMs summary for the 1st Grant Period (2013)

 

The following 5 STSMs with a duration between 1.5 to 3 months have been performed during the first grant period.